Zusammenfassung 1391331: EFHK-Vorfeld A Nord, Los 1.1, Phasen B - E, Tiefbau

Publiziert am: 19. Januar 2024

Flughafen Zürich AG

With phases B – E of the Apron A North project, Lot 1.1, the apron north of Dock A will be completely renewed, renovated and prepared for future developments. The sequencing is divided into five major construction stages. To implement the measures, replacement concrete pavements including foundations, adjustments to asphalt pavements, new construction of stacking basins under the terrain, section of media channel and various special shafts, adaptations and new construction of drainage, electrical supply, pressure pipes, as well as the demolition of the existing apron including all service lines must be carried out.


Auftraggeber: Dezentrale Bundesverwaltung / öffentlich rechtliche Organisationen
Kategorie: Zusammenfassung
Sprache: en
Abgabetermin: abgelaufen
Tags:
  • 45000000: Bauarbeiten
Gruppen:
  • CW: Bauarbeiten
Untergruppen:
  • CW-O: Sonstige
(gemäss Klassifizierung it-beschaffung.ch)

Zeitplan

Datum Ereignis Kommentar
19. Januar 2024 Publikationsdatum
5. April 2024 Abgabetermin 11:00

Kontakt

Flughafen Zürich AG
Postfach
8058 Zürich-Flughafen
Telefon: 043 816 00 54
E-Mail-Adresse:  
Dominik.Reusser@zurich-airport.com